Installations · 2018 — present

The work is the evidence.

A partial list of the buildings where Ballistiglass holds the line. Some were donations, carried by the Ballistiglass Charitable Foundation. Some were commissioned. Each one is installed, in use, and documented.

Donations · carried by BCF

Where we began.

The first installation we ever completed was donated. So were the next three. Each was placed in a community touched by the events of February 14, 2018.

  • Elementary school main entry with ballistic glazing installed. Donation · 2018

    Parkland, FL · K–5 public school

    Heron Heights Elementary

    The first Ballistiglass install. Donated to a Parkland elementary school in the months after February 14, 2018.

  • High school campus entry with ballistic glazing. Donation · 2019

    Parkland, FL · Public high school

    Marjory Stoneman Douglas HS

    Donation to the school community. Specified and installed by our associates alongside the administration.

  • Community center with ballistic glazing at the entry. Donation · via JAFCO

    Coral Springs, FL · Community center

    Eagles' Haven

    A wellness center serving families affected by the events of February 14, 2018. Installed in partnership with JAFCO.

  • Memorial entry with protective glazing. Commercial install

    Miami Beach, FL · Memorial institution

    Holocaust Memorial of Miami Beach

    Commissioned install protecting an institution of memory and public record.

Commissioned installations

Sanctuaries, reception, and public buildings.

Paid installations specified and completed by our associates. Each build follows the same protocol as the donations — same materials, same testing, same installation team.

  • Sanctuary entry doors at Temple Kol Tikvah in Parkland. Commercial install

    Parkland, FL · Sanctuary

    Temple Kol Tikvah

    Sanctuary entry glazing, commissioned by the congregation. BallistiMAX with the BallistiSHOCK reactive layer.

  • Commercial reception lobby with BallistiMAX installed, stickers marking stopped rounds. Commercial install

    Tamarac, FL · Commercial reception

    Reception lobby, Tamarac

    Reception build with stopped rounds documented on the glass face during field testing.

  • Government reception with walk-through detection and ballistic glazing. Commercial install

    East Coast · Government facility

    Government reception

    Full reception build — BallistiMAX at the glazing line and BallistiSCAN walk-through detection at intake.

The record

Every install is logged. Every spec is on file.

When an associate from our specifications team responds to a new request, the conversation starts from the same baseline: we have done this before, in buildings like yours, and the paperwork is on file. School boards, congregations, and government specifiers can request installation documentation, UL 752 certification, and third-party ballistic test reports at intake.